Enphase
5P: Yellow 1 Flash

No Communication with IQ Gateway

IQ Battery 5P LED flashes yellow once per cycle — battery is not communicating with the IQ Gateway.

IQ Gateway is offline or powered offComms Kit 2 (COMMS-KIT-02) USB cable not plugged into IQ GatewayWired control cable between Comms Kit and battery is disconnectedIQ Gateway firmware needs update
STEP 1
Check IQ Gateway is powered and shows solid green Network LED. Check Comms Kit 2 USB dongle is firmly plugged into IQ Gateway USB port
STEP 2
Trace the wired control cable from Comms Kit 2 to the battery control port. Cable must be fully seated at both ends. Power-cycle IQ Gateway (unplug from socket, wait 30s, reconnect)
Gateway is confirmed online, Comms Kit seated, control cables connected — fault persists for more than 20 minutes. Escalate to Enphase support
Need full interactive diagnosis?
Faultpath walks you through decision trees, fault codes, and commissioning — built for solar & battery engineers.
Open Faultpath

More Enphase fault codes

ACVOOR
AC Voltage Out of Range
ACFOOR
AC Frequency Out of Range
DC Res Low
DC Resistance Low (Ground Fault / GFDI)
DC Too Low
DC Input Voltage Too Low
DC Too High
DC Input Voltage Too High